Umicore

A solution for the internal transport of lead blocks of 5 tons thanks to our Shifter.

Challenge

Heavy Load vehicle at Umicore for internal transport of lead blocks

Umicore was looking for a flexible transport system for the internal transport of lead blocks with a maximum weight of 5 tons. The transport was done with a large forklift truck that could only transport 1 lead block at a time.

Solution

Heavy Load vehicle at Umicore for internal transport of lead blocks

AVT has built 2 transporters from the Shifter range with a capacity of 60 tons each. This makes it possible to transport 12 lead blocks per transporter.

Learn more about our Shifters

See all our references

Discover more